måndag 25 april 2016

Week 5 - Installation of cooling system

Mambo!

Five weeks and Kolandoto Hospital is soon to be a hospital with close to full resilience to power outages. The week has unfortunately not been that exciting since most of the "entertaining" installations were finished last week. This week we have been installing the air condition in the UPS-rooms and visited the bank... twice. We also managed to find a faulty installation in the Eye theater, which we later got corrected. The solar panels were directly connected to the battery whereas they are actually suppose to go through the inverter before charging the batteries. This way we get the full potential of the panels. This week we are hoping to be able to perform discharging tests on the batteries in eye theater to see if they perform as intended.

The following pictures gets to sum up this week.
 
 
The AC retailer
 
             
                                Not aesthetically appealing but fully functional                    AC installation in progress

 
The evening jogs in Kolandoto are truly something
 

Hope you enjoyed reading!
- Martin 

Inga kommentarer:

Skicka en kommentar